Potato Planter Skips and Doubles: A Test-Row Check
A planter can deliver the correct total number of seed pieces and still leave gaps because doubles offset skips. A test row reveals both problems and gives the operator a baseline before the main block is planted.

Inspect a short planted length
Stop and secure the machine before approaching. Open a representative length of row and measure the intervals between seed pieces. Record missing positions and two pieces dropped together separately. If several rows are planted, log results by row so a single row unit does not disappear in an average.
Compare seed pieces and meter setup
Check the range of seed-piece sizes against the manufacturer’s recommendations for the fitted cups or metering system. Confirm drive settings and look for differences between row units. If the issue starts after refilling or at a specific hopper level, record that condition during the next test.
Run one controlled comparison
At the same spacing target, change one variable within the operator’s manual and dig a second test row. Compare the pattern as well as the total drop count. Repeat after changing seed lots or moving from firm ground to a much looser bed.
For related equipment guides, see the ShengHang farm machinery blog.